Get to know the scope of works before pricing

Search for jobs by construction industry, CPV code, and area. You can read the bill of quantities, design, and technical specifications with an analysis that shows the scope of work before you start calculating.

From announcement to scope of works

  • Construction industry or CPV code

    You choose an industry, for example roofing, thermal modernization, or road works. You take the CPV code from a similar announcement that already suited you.

  • Radius from base

    You specify the address and radius where it pays to transport people and equipment.

  • Version of the bill of quantities you are calculating from

    The timeline on the card separates original documents from those added later, and the download date next to the attachment shows which version you are calculating from.

  • Bid security visible immediately

    On the card, you can see if the procedure requires bid security. From there, you can apply for a bid guarantee online with the partner, Gwarancje24.

  • Deadlines for several tenders at once

    Observed procedures appear in the calendar with deadlines for submitting bids, questions for the tender specifications (SWZ), and bid opening.

Construction and infrastructure category

Start from your specialization

Renovations, roads, installations, roofs, demolitions. Choose one or more industries and narrow down the results by query, CPV code, and area.

See construction tenders (opens in a new tab)

The link opens a list of active procedures in the construction industries.

  • Construction: renovation
  • Energy efficiency upgrades
  • Roofing
  • Roadworks
  • Plumbing and sanitation
  • Structural works
  • Sport and recreation
  • Demolition
  • Windows and doors
  • Electrical works
  • Fencing
  • Road maintenance
  • Construction supervision
  • Technical documentation
  • and more

Before you prepare a cost estimate

Four things before pricing

  1. On-site visit

    If the SWZ requires an on-site visit, plan it before the bid submission deadline.

  2. Questions for the buyer

    If there is a discrepancy between the bill of quantities and the design, you clarify it with a question to the SWZ within the specified period.

  3. Bid security

    You check the amount, form, and deadline for submitting bid security in the SWZ.

  4. Time to estimate

    In the basic procedure, the minimum deadline for a bid for construction works is 14 days. If an on-site visit is required, the buyer must extend it.

Before pricing, check the current tender specifications (SWZ) for the given procedure.

Questions from construction contractors

Nie ma tu Twojego pytania? Napisz do nas.

How to find construction tenders in your specialization?

Select the industry in the construction and infrastructure category, for example, renovations, energy efficiency improvements, or road works. Add the type of work or CPV code and specify the area where you work. You will save this set of entries and open it with one click next time.

What does the document analysis check for construction works?

It helps to read items and units from the bill of quantities, gather works from the design or PFU, link them to technical specifications, and detect temporary and associated works. When answering from 'Show source', you open a fragment of the document.

What to do if the bill of quantities does not match the design?

Ask the buyer before the deadline for questions regarding the SWZ. This deadline will be shown on the calendar for the observed procedure, and a modified document on the timeline tab will be marked as added later.

Is an on-site visit required in a construction tender?

Only if the buyer requires it in the SWZ. You will also find the method of conducting and confirming the visit, for example, with a protocol, in the SWZ.

Find a construction tender. Know the scope before you calculate.

Check what has been announced in construction in your area.

On the account, you save the industry and area as a set, and you read the documentation with an analysis tailored to construction works.