Get to know the scope of works before pricing
Search for jobs by construction industry, CPV code, and area. You can read the bill of quantities, design, and technical specifications with an analysis that shows the scope of work before you start calculating.
From announcement to scope of works
Construction industry or CPV code
You choose an industry, for example roofing, thermal modernization, or road works. You take the CPV code from a similar announcement that already suited you.
Radius from base
You specify the address and radius where it pays to transport people and equipment.
Scope of works from several documents
The analysis includes questions about the bill of quantities, design or functional programme (PFU), technical specifications, and related works. “Show source” opens the relevant passage in the file.
Version of the bill of quantities you are calculating from
The timeline on the card separates original documents from those added later, and the download date next to the attachment shows which version you are calculating from.
Bid security visible immediately
On the card, you can see if the procedure requires bid security. From there, you can apply for a bid guarantee online with the partner, Gwarancje24.
Deadlines for several tenders at once
Observed procedures appear in the calendar with deadlines for submitting bids, questions for the tender specifications (SWZ), and bid opening.
Construction and infrastructure category
Start from your specialization
Renovations, roads, installations, roofs, demolitions. Choose one or more industries and narrow down the results by query, CPV code, and area.
The link opens a list of active procedures in the construction industries.
Before you prepare a cost estimate
Four things before pricing
On-site visit
If the SWZ requires an on-site visit, plan it before the bid submission deadline.
Questions for the buyer
If there is a discrepancy between the bill of quantities and the design, you clarify it with a question to the SWZ within the specified period.
Bid security
You check the amount, form, and deadline for submitting bid security in the SWZ.
Time to estimate
In the basic procedure, the minimum deadline for a bid for construction works is 14 days. If an on-site visit is required, the buyer must extend it.
Before pricing, check the current tender specifications (SWZ) for the given procedure.
Questions from construction contractors
Nie ma tu Twojego pytania? Napisz do nas.
How to find construction tenders in your specialization?
Select the industry in the construction and infrastructure category, for example, renovations, energy efficiency improvements, or road works. Add the type of work or CPV code and specify the area where you work. You will save this set of entries and open it with one click next time.
What does the document analysis check for construction works?
It helps to read items and units from the bill of quantities, gather works from the design or PFU, link them to technical specifications, and detect temporary and associated works. When answering from 'Show source', you open a fragment of the document.
What to do if the bill of quantities does not match the design?
Ask the buyer before the deadline for questions regarding the SWZ. This deadline will be shown on the calendar for the observed procedure, and a modified document on the timeline tab will be marked as added later.
Is an on-site visit required in a construction tender?
Only if the buyer requires it in the SWZ. You will also find the method of conducting and confirming the visit, for example, with a protocol, in the SWZ.
Guides for works contractors
This might be more like your situation
- Type of tenderTenders nearby
You are looking for orders within a radius of the company's registered office, from the latest listings.
- Your situationBusiness owners who prepare their own bids
You run a company and handle tenders yourself.
- Type of tenderTender with bid security
The tender requires bid security, and you do not want to freeze cash.
- Type of tenderTenders below the threshold
Are you interested in smaller orders and requests for quotations, including from the Competition Database.
Find a construction tender. Know the scope before you calculate.
Check what has been announced in construction in your area.
On the account, you save the industry and area as a set, and you read the documentation with an analysis tailored to construction works.